|
Contracts amounting to over two hundred ten thousand dollars successively placed for stones, window frames, railing, steel, cement, required for the erection of the Octagon, Cylinder and Dome of the Bab's Sepulcher raising to sixteen hundred tons total tonnage ordered from Italy. (11:8) A quarter-century old project is terminated through the construction of the last two terraces connecting the same edifice with the Templar Colony at the foot of Carmel.
(11:9)
|